Read from the BOTTOM up.......
The new timber shed is built.
Work on the extension begins with Sewers..!!
Happy Xmas..!!!
All painted, the race team moves in..!!!!
Shiver me timbers.........
After a long wait .........
On to interior design.!!!!
Looking good, just the gutters to do..!!!
A wet November morning.......
The Base is Finished !!!!!
Saturday, February 18, 2006
Building site
After the pipework was passed by the building inspector, trenches were dug out by hand, concrete footings put in, and then trenchblock construction to bring up to ground level, all now backfilled, and ready for the concrete floor slab.