Read from the BOTTOM up.......
Happy Xmas..!!!
All painted, the race team moves in..!!!!
Shiver me timbers.........
After a long wait .........
On to interior design.!!!!
Looking good, just the gutters to do..!!!
A wet November morning.......
The Base is Finished !!!!!
Better weather for the final push !!!
Concrete arrives for the first half
Saturday, February 18, 2006
Work on the extension begins with Sewers..!!
The original sewer manhole was positioned where the extension is to be built. This required removing. All underground pipes, waste and surface drains, have all been replaced and repositioned as necessary.